In case you missed the previous days, you can find the links below:
Day 1: Removal of Kitchen Cabinets, Kitchen Base, Ceramic Tiles, and Electric Sockets
Day 2: Electrical Wall Schisms, Plaster Board Creation, Switch Boxes Installation
Day 3: Finishing With Plaster Boards and the Ceramic Tiles Installation
Day 4: All Ceramic Tiles Installed, Joints Filled With Grout, and Plasterboards Plastered
Day 5: Kitchen Installation and Quartz Countertop Measurement
We have finished with the kitchen installation and we have started painting all the walls around the kitchen. Tomorrow morning we will finish with the painting of the walls and install the quartz countertops and backsplash.
Below you can find the progress of the day:
All Kitchen Cabinets Fully Installed
ฮ ฯฮฟฯฮฟฮธฮญฯฮทฯฮท ฯฮทฯ ฮบฮฟฯ
ฮถฮฏฮฝฮฑฯ ฮญฯฮตฮน ฯฮตฮปฮตฮนฯฯฮตฮน. #10daysonly http://t.co/dddycwf3PB pic.twitter.com/kH3mIHAyR4
โ GNicolaou LTD (@GNicolaouLTD) April 2, 2014
Started with wall painting
ฮฯฯฮนฯฮต ฯฮฟ ฮผฯฮฟฮณฮนฮฌฯฮนฯฮผฮฑ ฯฮฟฯ
ฯฯฯฮฟฯ
ฯฮทฯ ฮบฮฟฯ
ฮถฮฏฮฝฮฑฯ #10daysonly http://t.co/D3c92MRu5E pic.twitter.com/v9OBVilA5J
โ GNicolaou LTD (@GNicolaouLTD) April 2, 2014
End of the day, 2 Hands of painting remain.
ฮคฮญฮปฮฟฯ 6ฮทฯ ฮผฮญฯฮฑฯ. 1-2 ฯฮญฯฮนฮฑ ฮผฯฮฟฮณฮนฮฑฮฝฯฮฏฯฮผฮฑฯฮฟฯ ฮญฮผฮตฮนฮฝฮฑฮฝ. #10daysonly http://t.co/dddycwf3PB pic.twitter.com/pTZWRtGXKH
โ GNicolaou LTD (@GNicolaouLTD) April 2, 2014
*****Follow Us on Twitter for Live Updates*****