In case you missed the previous days, you can find the links below:
Day 1: Removal of Kitchen Cabinets, Kitchen Base, Ceramic Tiles, and Electric Sockets
Day 2: Electrical Wall Schisms, Plaster Board Creation, Switch Boxes Installation
Day 3: Finishing With Plaster Boards and the Ceramic Tiles Installation
Day 4: All Ceramic Tiles Installed, Joints Filled With Grout, and Plasterboards Plastered
Today, we started installing Natura kitchen and took the measurements for the fabrication of the quartz countertop. The kitchen will be fully installed by Wednesday.
Below you can find the progress of the day:
Installation of the kitchen begins
Άρχισε η τοποθέτηση της κουζίνας #10daysonly http://t.co/D3c92MRu5E pic.twitter.com/1b7yPKi5ZH
— GNicolaou LTD (@GNicolaouLTD) March 31, 2014
Taking the necessary measurements for the Fabrication of the quartz countertop
Γίνετε το μέτρημα του πάγκου για την κατασκευή του τεχνογρανίτη. #10daysonly http://t.co/D3c92MRu5E pic.twitter.com/DMr7FqfFaa
— GNicolaou LTD (@GNicolaouLTD) March 31, 2014
Almost all Kitchen cabinets installed at the end of the day
Σχεδόν όλη η κουζίνα είναι τοποθετημένη, και θα τελειώσει μέχρι την Τετάρτη. #10daysonly http://t.co/wbmw0IQ8UF pic.twitter.com/Sp2etLEJYt
— GNicolaou LTD (@GNicolaouLTD) March 31, 2014