In case you missed the previous days, you can find the links below:

Day 1: Removal of Kitchen Cabinets, Kitchen Base, Ceramic Tiles, and Electric Sockets

Day 2: Electrical Wall Schisms, Plaster Board Creation, Switch Boxes Installation

Despite the difficulties, there is nothing better other than seeing positive progress over your project.

We managed to install most of the ceramic tiles on the floor and finish with the construction of the plaster board on the ceiling.

Below you can find the progression throughout the day:

Ceramic Tiles Installation on the Floor

Plaster Boards’ Plastering

All Ceramic tiles will be installed until tomorrow

 

The Job Until Now

 