In this renovation, the customer chose the Kitchen Model Natura, in the colour Rovere Miele, the white Quartz Countertop, and Egeo Beige for the Ceramic Tiles.

This renovation was made under ourĀ guidance and supervision.

In 9 days ONLY we completed the following tasks:

  • Removal of the kitchen
  • Removal of the concrete kitchen base
  • Removal of the ceramic wall
  • Removal of the ceramic floor
  • The Electrical slivers
  • Installement of the electrical connectors
  • 3rd hand plastering of walls
  • Ceramic Tile Floor Installation
  • Painting of the walls
  • New kitchen Installation
  • Countertop Measurement
  • Quartz Countertop Installation
  • Kitchen Sink installation and electrical connection
  • Final Paint work