See the before and after below.


In this renovation, the customer chose the Kitchen Model Ginger in the color Seta, and Calacatta for the quartz countertop. This renovation was organized by our company.

In 12 Days Only, the following tasks have been completed:

  • Disconnect previous electrical/water connections
  • Removal of the kitchen cabinets
  • Removal of the concrete base
  • Removal of the ceramic wall tiles
  • Installation of the new floor tiles
  • Construction of Plasterboard ceiling with spotlights above the sink
  • Construction of Plasterboard ceiling above the breakfast table
  • Build Plasterboard ceiling & plastering
  • The Electrical/Hydraulic slivers
  • Installment of the electrical connectors
  • Painting of the ceiling and walls
  • New kitchen Installation
  • Quartz Countertop Measurement & Installation

The Design Stage

As with all our customers, we created the following plan before ordering the kitchen cabinets from Italy.


Before the Renovation


After the Renovation


Do you want to learn more about our Kitchen Cabinets?
>> Click Here <<

Can you imagine how your new Kitchen would look like?
>> Design your Kitchen Online Here <<
(Does not work on mobile devices)



Do you want to learn more about our Kitchen Cabinets?
>> Click Here <<

Can you imagine how your new Kitchen would look like?
>> Design your Kitchen Online Here <<
(Does not work on mobile devices)